Getting Started
How to Use This Portal
Follow the steps below to successfully submit an application through the GCMA Works & Infrastructure Portal.
From the Dashboard, identify the service you require — Building Permit, Penalty, Temporary Structure, Road Blockage, Upload Documents, or Upload Projects. Click on the relevant card to begin.
Before starting your application, gather all required documents. Accepted formats are PDF, JPG, PNG, and DWG (CAD files). Maximum file size per document is 10 MB. See the document checklist below for each service type.
Fill in all required fields accurately. Ensure your Ghana Card number, property details, and contact information are correct. Incomplete applications will be returned for revision.
Attach all required documents to your application before submitting. Use the Upload Documents service for bulk document submissions linked to an existing application reference number.
After submission, you will receive a unique Application Reference Number (ARN). Save this number — you will need it to track your application status or communicate with our offices.
Use your ARN to check the status of your application online. Processing times vary by service type (see the table in the FAQ section). You will be notified by email or SMS upon approval or if additional information is required.
Document Requirements
Building Permit
- Completed application form (Form BP-01)
- Copy of Land Title Certificate or Lease Agreement
- Architectural drawings (site plan, floor plan, elevations)
- Structural engineering drawings (signed by registered engineer)
- Copy of Ghana Card of applicant
- Proof of property ownership or tenancy
- Environmental Impact Assessment (for large projects)
- Payment receipt of application fee
Temporary Structure / Road Blockage
- Completed application form (Form TS-01 or RB-01)
- Copy of Ghana Card of applicant or company registration
- Sketch or diagram of the proposed structure/blockage area
- Duration and dates of the temporary use
- Letter of consent from adjacent property owners (where applicable)
- Insurance certificate (for road blockage)
- Traffic management plan (for road closures)
- Payment receipt of application fee
Frequently Asked Questions
If you cannot find the answer you are looking for, contact our support team. Call (030) 296-0001, email info@gacentralma.gov.gh, or use our contact form. Our staff are available Monday–Friday, 8:00 AM – 5:00 PM.